Toggle sidebar
Water quality part 3
Standard Schulung

Water quality part 3

The following measures are required to ensure adequate water quality:

Every three months:

  • If you have a centralised hot water system, first flush the last hot water outlets detected with hot water for 30 seconds

  • If the temperature is below 55°C, check whether scald protection is installed

  • Document the temperature

  • Flush the cold water pipe for 30 seconds and document the temperature

Annually:

  • Remove the aerators from all outlets and either replace them with new aerators or treat them by soaking them in descaler and then in a chlorine solution. Do the same with shower heads and shower hoses

For a detailed water analysis, contact W.H.U. GmbH:

Bodenlehenstr. 15 | 5500 Bischofshofen | AUSTRIA

Phone: +43 6462 32852 | E-Mail: office@whu-lab.at

Category
Water quality
Operating areas
Building services
Trainees
Weitere Informationen
Horeca HERO
Request HERO+

Get all HERO+ features for only :price per month.

Advanced content handling

Create custom content for your training program

Hide not needed trainings from your training program

Advanced user handling

Automated user activation in the future.

Move employees to a new business without loosing his trainings progress

Upload safety data sheets

Upload safety data sheets for your training program

Share documents with reviewers.

Share documents with reviewers